New Paving Slabs
Photos by year
A club further improvement project was undertaken in November 2026 to:-
a) replace uneven paving slabs & concrete outside the toilet block and bowls shed - thus removing potential trip hazards
b) replace two sets of steps leading down to the green - and
c) point between the flags in front of the clubhouse.
The project was fully funded by Sport England - and carried out by the family firm of HD Builders (Derby) Limited - Aaron Bailey (MD), Paul (father) and Simon (son).
The end result has greatly improved the visual aspect of the club.
Before
After
Further work to re-position two historic carved stone statues, that form part of the heritage of the club, is the be carried out by club members.